Switching from Tradify or Another Job Management App: A Data Migration Checklist
Trades businesses don't switch job management software on a whim. The decision usually follows months of working around a limitation: you can't see real-time job costs, the office can't get the reports it needs, or you've outgrown a tool that was built for single-trade sole operators and now you're running a team of twelve across multiple project types.
Tradify is a job management app that many tradies use, particularly in the early stages of building a business. It handles quoting, scheduling, invoicing and basic job tracking well. But as a business grows, the need for project-level financial visibility, integrated team communication and business-wide reporting often pushes owners toward a broader platform.
Whatever the reason for your switch, the risk is not in the decision. The risk is in the migration. A poorly executed data move can mean lost job history, duplicated Xero contacts, missing attachments and a team that reverts to the old system because nobody showed them the new one properly.
This checklist is designed to prevent that.
Before You Export Anything: Decide What You Actually Need
Not all historical data is worth migrating. Before you touch an export button, answer three questions:
- How far back does your operational history matter?: For most trades businesses, open jobs and the last 12 to 24 months of completed jobs are worth bringing across. Anything older can usually be archived in a CSV and stored externally.
- Are your price lists and rate cards current?: A migration is a good time to audit your pricing. Importing outdated rates into a new system just carries the problem forward.
- Are your client records clean?: Duplicate contacts, old phone numbers and lapsed clients who haven't called in three years don't need to follow you to the new platform.
Spend a day on this audit. It will save you far more time on the other side.
Step 1: Export Your Clients and Contacts
This is your most important dataset. Every quote, job and invoice traces back to a client record.
From Tradify (or whichever platform you're leaving), export your full client list to CSV. Most job management apps support this. Check that each record includes:
- Business name and trading name
- Primary contact name, phone and email
- Site address and billing address (these are often different for trades clients)
- Any client notes or tags you've applied
Before importing into your new platform, open the CSV and remove obvious duplicates. If the same business appears under three slightly different names because someone typed it differently each time, consolidate them now.
Step 2: Export Open Jobs and Job History
Open jobs are non-negotiable. Every active quote, scheduled job and in-progress project must come across intact, including:
- Job number and description
- Client link
- Assigned staff
- Current status
- Any notes or site instructions
- Quoted amounts and any variations
For completed job history, refer back to your decision from the pre-migration audit. If you're bringing across 24 months of history, filter your export accordingly. Importing five years of closed jobs into a new system adds noise and slows onboarding.
Note that some fields in your old system may not map directly to fields in the new one. Document any gaps before you import, so nothing gets silently dropped.
Step 3: Export Price Lists and Rate Cards
If your quoting relies on a library of labour rates, materials or service items, export that list carefully. Check:
- Item codes match what you use on invoices (especially if Xero is involved)
- GST treatment is correct on each line item
- Any trade-specific pricing tiers or client-specific rates are captured
This is another good opportunity to clean up. If you have 400 line items and regularly use 60 of them, consider importing only the active ones and archiving the rest.
Step 4: Export Staff Records and Timesheet Data
Your staff list needs to transfer across with roles and permissions intact. Export:
- Full name, contact details and role
- Any certifications or licence numbers stored in the system
- Historical timesheet data if you want to maintain continuity for job costing or payroll reconciliation
Timesheet history is worth bringing across if your new platform uses it to inform project cost calculations. In Opus, hours logged against a project feed directly into real-time cost tracking, so historical timesheet data has operational value, not just archival value.
Step 5: Download Attachments and Documents
This step is easy to underestimate. Job management platforms often accumulate years of photos, signed forms, compliance documents, certificates of completion and site notes. These don't export in a CSV.
Go through your active jobs and recent history manually and download any attachments that matter. Organise them by client or job number before the migration so they can be re-linked in the new system. If your new platform integrates with SharePoint or a document management layer, this is the time to set up that folder structure.
Step 6: Reconnect Xero Carefully
This is where migrations most commonly go wrong.
If your old job management app was connected to Xero, disconnecting it and reconnecting a new platform requires care. The main risks are:
- Duplicate contacts: : If Xero already has your clients from the old sync, importing them again from the new platform creates duplicates. Before connecting Opus (or any new platform) to Xero, audit your Xero contact list and clean it up first.
- Duplicate invoices: : Any invoices that were pushed from the old system to Xero should be marked as such. Do not re-push them from the new system.
- Chart of accounts mapping: : Your new platform will need to map its invoice line items to the correct Xero accounts. Set this up before you start raising invoices in the new system, not after.
Opus uses a two-way Xero sync, which means changes made in Xero (payments received, for example) reflect back in Opus automatically. That's useful, but it also means the initial connection needs to be clean. Take your time here.
Step 7: Run Both Systems in Parallel
For a period of two to four weeks after go-live, run both systems. New jobs go into the new platform. Old jobs that are still active get completed in whichever system they started in, or migrated across individually if they're long-running.
This parallel period serves two purposes. First, it gives your team a safety net while they learn the new system. Second, it lets you catch anything that didn't migrate correctly before you're fully dependent on the new platform.
Set a clear cut-over date. Open-ended parallel running tends to extend indefinitely, which defeats the purpose of switching.
Step 8: Train the Team Before Cut-Over
Software migrations fail at the human layer more often than the technical one. If your team doesn't understand the new system before cut-over day, they'll revert to old habits, create workarounds, or simply stop using it.
Train in two stages. First, show people the parts of the system that affect their daily work: logging time, updating job status, uploading photos, messaging within a job. Second, once those basics are comfortable, introduce the broader features: project cost visibility, reporting, equipment tracking.
For a trades business moving to Opus, the team chat feature is often the first thing that changes daily behaviour. Conversations linked directly to a job or client mean that nothing gets lost in a separate messaging app, and the office can see what's happening on site without a phone call.
Where Opus Fits for Trades Businesses
Opus is built for businesses that want project management, financial tracking and team operations in a single database rather than several apps that talk to each other imperfectly.
For a trades business, that means job costs (labour, materials, subcontractors) update in real time as timesheets are logged and expenses are categorised. The P&L for each project is visible without a manual export. Equipment assets can be tracked, allocated to jobs and flagged for calibration or maintenance. The CRM holds the full client history, including every job, quote and conversation.
If you're comparing platforms, the [Opus vs Tradify comparison page](https://opus.net.au/compare/tradify) covers the differences in detail.
The Business Triangle framing is relevant here: trades businesses that are growing tend to find their admin time expanding to fill whatever space is available. Disconnected tools are a primary cause. When job data, financial data and team data live in the same system, the reconciliation work that usually happens between those systems disappears.
A Note on the Decision Itself
If you've been considering a switch for a while, the checklist above probably looks manageable. That's because it is. A well-prepared migration for a trades business with a few hundred clients and a year or two of job history typically takes a few days of focused work, not weeks.
The businesses that struggle are the ones that start the migration without cleaning their data first, or that try to import everything without deciding what actually needs to come across.
Do the audit. Export methodically. Reconnect Xero carefully. Train before you cut over.
For more on how Opus supports trades and project-based businesses, visit [opus.net.au](https://opus.net.au).
